After a week of steam bending, sizing, cutting and hand planing I have all the planks for the bottom just right. It came out pretty good. It was somewhat hard to get the a nice even fit over the length of the boat. Was able to keep all seams inside 1/16" (1.5 mm) wide. The gap will be filled with 3M5200 during final assembly. Plank No. 1, 2, 4 and 5 are full length boards, and No. 3 is split 1/2 way.


The center lines for the frames are marked with different colors, from the marks in the keel and chine. Want to distinguish the different frames because of the different screw sizes. Main- and auxiliary frames (black and green) takes a #8 x 1 3/4" screw and the intermittent frames (red) takes a #8 x 1" screw. Also marked the where not to put a screw.


Once the planks have dried for a week or so, it's time to take the planks off again, seal with CPES and permanently install with 3M5200.

1 comment:

rdapron said...

Wow, I thought I was the only guy who used different color lines marking the bottom frames. Good job.

rob